Specialised Steelwork

One New Change London EC4

Specialised Steelwork / One New Change London EC4

Overlooking St Paul’s Cathedral in the heart of the City, One New Change is London’s premium shopping destination. During this project we were asked to provide drawings for areas of both structural steelwork and architectural metal work.

The structural element was a large loading bay platform consisting of many UC stubs anchored into a concrete slab, internal UB ties and outer PFC ties. This also included a ramp area with beams angled to the slab and tapered to suit.

The architectural package consisted of 8 No. staircases all with loose bolted panels, posts & handrail mounted to existing steel carcass’s by others.

Date:

September 23, 2009

Category:

Commercial